Lemsford Road
Multiple Housing

RESET completed a full electrical design and installation for this 14-room HMO project, working closely with the architect, client, and construction team from the early planning stages through to completion.

The project included a complete three-phase power system across all four floors, with dedicated supplies for bedrooms, en-suites, kitchenettes, communal areas, external spaces, and work areas, as well as a full Cat 6 data network to provide reliable connectivity throughout the building.

client

Commercial

year

2026

services

Full Reset design, test & commission 

Initial Consultation & Client Briefing

  • Worked alongside the architect throughout the project to coordinate the electrical design with the wider construction requirements
  • Delivered a complete electrical solution for a 14-room HMO, incorporating the specific requirements of Building Control and other relevant organisations
  • Considered the requirements of individual rooms, en-suites, Jack & Jill bathrooms, kitchenettes, communal areas, and external spaces

 

Electrical Design & Planning

  • Designed a comprehensive three-phase electrical distribution system with sub-distribution units serving each of the four floors
  • Planned individual electrical supplies for room kitchenettes, en-suites, Jack & Jill bathrooms, communal kitchen, garden, storage, and workspace areas
  • Designed structured Cat 6 data infrastructure to provide reliable connectivity and Wi-Fi throughout the building
  • Integrated electrical requirements for fire safety, emergency lighting, extraction, external lighting, and communal areas

 

Load Calculations & Compliance

  • Carefully designed the electrical load distribution to maintain the building’s total demand within the 100A per phase capacity of the incoming three-phase supply
  • Appointed Norwood Consultants, Hemel Hempstead, to assist with specialist load distribution and mains supply design
  • Designed the installation to meet the requirements of BS 7671, Building Control, and relevant fire safety requirements

 

Product Selection & Specification

  • Specified suitable distribution equipment and sub-distribution units to efficiently serve all four floors of the building
  • Selected appropriate fire alarm, emergency lighting, extraction, external lighting, and data infrastructure systems
  • Designed lighting and electrical provisions for communal gardens, storage areas, emergency escape routes, and workspace facilities
  • Pre-Wiring / Rough-In Stage

    • Installed extensive electrical infrastructure throughout the 14-room HMO, including four floors of three-phase distribution and sub-distribution
    • Installed all extraction ductwork, external grilles, and electrical provisions for extractor hoods and ventilation fans
    • Installed Cat 6 data cabling throughout the building to provide reliable connectivity and support a modern working environment
    • Coordinated electrical works with the architect, builders, and other specialist trades throughout construction

     

    Final Fit-Off

    • Completed electrical installations to individual bedrooms, kitchenettes, en-suites, and Jack & Jill bathrooms
    • Installed communal kitchen and workspace facilities, along with garden and storage area supplies
    • Installed external lighting controlled by time clocks to illuminate walkways and communal areas
    • Installed garden lighting and lighting provisions for external spaces

     

    Testing & Certification

    • Thoroughly tested and commissioned the electrical installation across all four floors
    • Tested and commissioned fire alarm and emergency lighting systems to support the building’s fire safety strategy
    • Provided relevant electrical certification and compliance documentation

     

    Client Walkthrough & Handover

    • Demonstrated key electrical systems and controls throughout the building
    • Provided guidance on the operation of communal, external, emergency, and fire safety systems

     

    Aftercare & Ongoing Support

    • Delivered a future-focused electrical infrastructure capable of supporting the demands of a modern 14-room HMO
    • Provided a robust Cat 6 data network to support reliable connectivity and future working requirements
    • Designed the electrical distribution with capacity and flexibility considered for future maintenance, upgrades, and potential additions